Needed a new skipole for the boat.

So I took off to the Stainless Tube factory, got a 2M length and then paid a visit to a local engineer who helped me TIG weld it up!

So I took off to the Stainless Tube factory, got a 2M length and then paid a visit to a local engineer who helped me TIG weld it up!
You must be logged in to post a comment.